Menu

Services

WHAT WE OFFER SUSTAINABLE SOLAR SOLUTIONS,
FOR FUTURE BUSINESSES

At Emirates Electrical Engineering, we continuously aim to deliver you fully-customized solutions to respond to your project’s requirements with ultimate flexibility and responsiveness. We adhere to the idea of customizing turnkey projects that propel the prospects of the relationship with our clients. EEE delivers unique service models catered to clients with different energy requirements.

Solar Division

As an extending energy venture in the UAE, Emirates Electrical Engineering lays out its potential to become the largest provider of the solar solutions. We combine the inexhaustible solar power with the latest technology and our absolute determination to communicate sustenance via optimized electrical energy use.

Cable Division

More than 40 years of experience makes our project team the masters of handling turnkey projects consisting of design, Installation, Testing & Commissioning of underground power cables ranging up to 400kV, inclusive of pilot cables, telephone cables, fiber optic cables etc.

Substation Division

EEE has nearly four decades of experience in Turnkey substation projects from design of substation, using various designs required for projects right up to 400 kV, to the selection of equipment required to meet the demands of the highly sensitive link in the power network.

EEE Has completed 50 Nos 132/11 kV Substations on turnkey basis and several critical brownfield projects that has been satisfactorily completed & commissioned so far. Engineers with vast experience in design, erection, testing and commissioning of various equipment, are backed by well-equipped range of test equipment and tools.

Overhead Transmission Line Division

EEE’s history stretches back to 1977, when it completed design, supply and installation of high voltage overhead lines for the UAE’s Central and Northern region. Later in 1997 EEE made the first interconnection of the power systems of the Northern Emirates (West Coast interconnection 220 kV & 132 KV lines).

In 2005, we finalized the overhead lines for the first Emirates National Grid 400 kV and 220 kV. EEE is the only one company in UAE who has worked in all the phases of interconnection of Emirates. During these years EEE emerged as a leader in the field of Power Transmission Lines in U.A.E and became the first in completing 400kV monopole overhead lines project in the Middle East.

Take control of your energy future and start saving with Emirates Electrical Engineering LLC,Contact us today!